Systematic Layout Planning (SLP)

 

Consultancy services

To advice and assist you to plan and layout your new or improve your existing facilities and bring you through the process of Systematic Layout Planning.

 

In-Company Training

Systematic Layout Planning Workshop

 

Systematic Layout Planning (SLP) produces a well-planned facility that results in lower operating cost, minimization of waste, lower worker fatigue and a healthier working environment, resulting in higher productivity and profitability.

Systematic Layout Planning (SLP) is widely used in both the manufacturing and service environment whenever there are:

, Companies setting up new facilities
, Expansion of the current facilities
, Re-arrangement of existing facilities
, Consolidation of current operations
, Relocation of operations and facilities

A good layout plan factors in both workspace and workplace design. Work processes and material flow requirements are analysed for activities such as storage, production, work-in-process, final assembly, finished-goods packing and warehousing. The methodology should not be confined only to within the four walls of the factory. It should be extended to the site boundary as well, to take in to account the movement and circulation of trucks and containers in the compound. SLP should also factor in future changes in:

, Product mix
, Process improvement and equipment upgrading
, Organisation and personnel growth
, Workplace design

The concept is not confined to production set-ups. It can also be used for laying out an office complex and used whenever a company moves to a new office premises.

There are many established methodologies used by Industrial Engineers in layout planning. The one adopted by TEIAN is based on the Systematic Layout Planning developed by Richard Muther and John D Wheeler. TEIAN have further adapted it to accommodate local conditions in Singapore and the region.

, Step 1 : Data collection and charting of relationships
, Step 2 : Establish space requirements
, Step 3 : Development of block layouts
, Step 4 : Detailing of selected layout
, Step 5 : Installing of layout

PRODUCTS AND SERVICES

 

SME Services

SME e-ClinicTM (Free)

SME Clinics

SME Coaching Programme

Risk Management for Workplace safety

Industrial Relocation

 

Facility Set Up

Facility Layout Design

Project Management Services

Setting Up Food Factory

One-Stop Building Plan Submissions

   and Licencing

MOM factory licence

AVA food licence

SCDF storage Licence

 

General and Strategic Management

Government Grants Applications

Strategic Business Planning

Company Diagnosis

Performance Management System

 

Process Improvement

Process Mapping

Lean Management Systems

HACCP, ISO 22,000

ISO 9001

Productivity Specialist Development

Systematic Layout Planning

Risk Management for Industrial Relocation

Total Quality Management

Cost of Quality

Quality Circles

Suggestion Schemes

5S Good Housekeeping Practices

7 Wastes Reduction Programme

IE Techniques

Green Productivity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 